Facility Operations RFP

Final RFP

The RFP for Shoreway Facility Operations services was issued on November 1, 2007.

Proposals were received on March 4, 2008. The SBWMA Facility Operations RFP Selection Committee presented its recommendation to the SBWMA Board of Directors on July 24, 2008.  You can view the Facility Operations Proposer Presentations in PDF or movie form.

If you have any questions, please contact Hilary Gans, SBWMA Facility Operations Contract Manager, at hgans@rethinkwaste.org.

Attachments

1 – Joint Powers Agreement (JPA) - PDF (2.4MB)

2 – Draft Shoreway Recycling and Disposal Center Operations Agreement - PDF (191K)/ WORD

Facility Agreement Attachments:

  • Attachment 1 Definitions PDF (54KB) / WORD (UPDATED AS OF 1/4/08)
  • Attachment 2-F. MRF Equip Acceptance Test PDF (25K)
  • Attachment 2-G. Product Quality Standards PDF (12K)
  • Attachment 3. General Operating Standards and Procedures PDF (51K)
  • Attachment 5. Site Map/Vehicle Parking Area PDF (112K)
  • Attachment 6. Permits PDF (11K)
  • Attachment 10. Liquidated Damages PDF (20K)
  • Attachment 12-A. Procedure for Initial Rate Adjustment Process PDF (25K)
  • Attachment 13-A. Procedure for Annual Rate Adjustment Process PDF (25K)
  • Attachment 14 Self-haul Reconciliation Formula PDF (15K)
  • Attachment 16. Performance Bond and Continuation Certificate PDF (15K)
  • Attachment 17. Guaranty PDF (33K)

3 – Shoreway Recycling and Disposal Center Facility Operations Proposal Forms

  • Cost Proposal Worksheet Forms - EXCEL (72.5k)
  • Cost Proposal Summary Forms - WORD (100k)

4 – MRF Equipment and Installation - PDF (112k)

    Includes:
  • 4 - A MRF Equipment and Installation Specifications
  • 4 - B  MRF Equipment and Installation Cost Proposal Forms UPDATED 2/4/08 (WORD)
  • 4 - C  Draft Product Quality Specifications
  • 4 - D Draft System Acceptance Test

5 – List of Operational Equipment and Personnel Used by Allied Waste - PDF (312k)

6 – Shoreway Recycling and Disposal Center Facility Permits - PDF (1.8MB)

7 – Shoreway Recycling and Disposal Center Master Plan Information - PDF (3MB)

8 – Conceptual Facility Plans and MRF Equipment Layout MRF Equipment Acceptance Test - PDF (244k)

9 – Tonnage and Site Information - PDF (1.6MB)

10 – Processing Agreement with Zanker Road Resource Recovery - PDF (2MB)

11 – Disposal Agreement Ox Mountain Landfill - PDF (5.6MB)

12 – 2005 Amended Operating Agreement with Allied Waste (Includes Organic Materials Processing arrangements) - PDF (500k)

13 – Collective Bargaining Agreements: Drivers and Helpers Local 350 IBT and Machinist Local 1414 - PDF (2.8MB)

14 – Auditor's Report of Allied Waste 2006 Shoreway Recycling and Disposal Center Facilities Operations - PDF (84k)

15 – Anti- Collusion Affidavit - PDF (16k)

16 – Proposers Code of Conduct - PDF (28k)

Facility Drawings

– 3726 SITE ALT 2A_4_25 - PDF (552k)

– 3726 SITE EXIST - PDF (264k)

– Existing Shoreway Aerial - PDF (64k)

– Existing - PDF (88k)

– Final Site - PDF (120k)

– Phase I - PDF (140k)

– Phase II - PDF (140k)

– Phase III - PDF (144k)

– SBWMA Air 000 - JPG (2.9MB)

– SBWMA Air 001 - JPG (2.9MB)

– SBWMA Air 002 - JPG (2.9MB)

– SBWMA Air 003 - JPG (2.8MB)

– SBWMA Overhead 004 - JPG (4.3MB)

– SBWMA Front 005 - JPG (2.4MB)

– Shoreway Recycling and Disposal Center Course 01 - PDF (132k)

– Shoreway Recycling and Disposal Center Course 02 - PDF (120k) 

– CAD Drawings of Site - ZIP (140k)

Selection Committee Recommendation Report

check for the little "blank space" hyperlinks, left over from old site.